PRIVACY POLICY

Privacy Policy This privacy policy discloses the privacy practices for (https://grandvacay.com), which is operated by (GrandVista Holdings LLC). This privacy policy applies solely to information collected by this website. It will notify you of the following: Information Collection, Use, and SharingWe are the sole owners of the information collected on Read more

The Big Reveal

Well, for those interested in the vision Lea has for this place, this is the post for you. Up until now, it has been moving walls, deciding where switches go, sanding sheetrock, and other necessary things that have set the stage for what’s about to happen, but none of it Read more

August Rush

We have seen a lot come together this month. Countertops, fireplace, painting, tile, even the driveway is getting finished. Labor Day weekend is almost here and we’ll be moving furniture around and making final preparations that weekend for an opening October 1, if possible.

Brick Facade

Brick is going well. Hope to have it done by the end of this week. My good friend Jorge is doing a great job, just like he always has! Less rain this week than the previous couple of weeks. Also passed rough electrical inside the building so starting to get Read more

Time for Steel

This is where building gets fun, when the walls and roof go up. So much visual impact in just a week! The front of the building will be brick, similar to the construction 5 years ago at 1425, just next store. In fact, these buildings are the same in almost Read more

Starting Foundation Walls

With the wet spring weather, and the high water table, I had to jump through quite a few hoops to get the footings passed. Had to install a drain system under the rear footing of the building to drain hydrostatic pressure from the subgrade in the winter/spring. Finally poured footings. Read more